You don't have javascript enabled. Good luck with that.
Pencarian
. jalan yang berada persis di bawah Flyover Karet Tengsin menuju ke Sudirman Park ini mengalami keru
Akibat sering dilalui kendaraan berat melebihi muatan (tonase) milik proyek apartemen Casa Domaine, kondisi aspal Jalan Raya Karet Tengsin, Tanah Abang Jakarta Pusat banyak yang rusak dan terkelupas.
photo istimewa - Beritajakarta.id

Apartment Construction Project Leads to Damaged Road

The construction project of Casa Domaine Apartment has damaged Jalan Karet Tengsin, Tanah Abang, Central Jakarta, due to many heavy vehicles carrying project materials always pass through the road. The damage level of the road located under Karet Tengsin Flyover towards Sudirman Park reaches 100 meters long and leads to traffic congestion.

The road is damaged is due to the passing of heavy vehicles transporting soil to the construction site which located right next to it

Based on beritajakarta.com observations, the road’s asphalt is already chipped and perforated. This condition makes the road bumpy and causes some motorists almost fell when trying to avoid the holes. Right next to the damaged road, a number of trucks and excavators are seen passing into an empty vacant land which is under construction as Casa Domaine Apartment.

“We already knew about this matter. We’ve checked the location. Indeed, the damage level is severe enough,” stated Head of Road Maintenance Section for Central Jakarta Road Public Works Sub-Department, Agustio Ruhuseto, Tuesday (8/5).

According to Ruhuseto, his party has repeatedly repaired the road by patching the holes. But, the repair did not last long because of the apartment’s construction project still ongoing.

“The road is damaged is due to the passing of heavy vehicles transporting soil to the construction site which located right next to it. Even so, we’ll repair the road again this week or next week at the latest,” he uttered.

On the other hand, Casa Domaine Apartment Project Controller, Iwan, denies the road is damaged because of heavy vehicles used in the construction works.

“Our trucks’ capacity is small, only 35-40 tons max. So, the road is damaged not because of this project,” he asserted.

He also claims that when the road was still being repaired, his party had yet to operate trucks or excavators to the project site. Those heavy vehicles began operating after the road is damaged.

Linked News
Popular News indeks
  1. Commission E Urges Residents to Increase Role in Preventing DHF

    access_time19-12-2024 remove_red_eye1219 personDessy Suciati
  2. Transjakarta Adjusting Service as Simpang Pramuka and Rawamangun Bus Stops Closed

    access_time18-12-2024 remove_red_eye1056 personAldi Geri Lumban Tobing
  3. Transjakarta, Telkomsel to Improve Service for Customers

    access_time19-12-2024 remove_red_eye910 personAldi Geri Lumban Tobing
  4. Acting Governor Monitors Food Stock at Kramat Jati and Cipinang Markets

    access_time19-12-2024 remove_red_eye736 personFolmer
  5. TMII Prepares Stuntman Show to Music Concert

    access_time23-12-2024 remove_red_eye692 personNurito